Henley Standard Property


Order your copy Advertise with us! HENLEY PAGES
Delivering the news from Henley on Thames and South Oxfordshire for over 100 years
  News     Sport    Celebrity   What's On Regulars Community Info Henley Standard TV Lifestyle Property Jobs Classifieds Gallery Trade
                               Follow us    Follow us    Newsfeed Search the Henley Standard  
Toll bridge just weeks from re-opening
Published 18/08/14

WHITCHURCH Bridge is set to re-open next month following an 11-month refurbishment.

The crossing has been shut since October while being strengthened to cope with the weight of modern traffic.

It was due to re-open in April but the 4.4 million scheme was delayed by problems dismantling it in November and then the floods in January and February.

The private company which owns the 102-year-old toll bridge is expected to name an exact date for the re-opening shortly.

Secretary Geoff Weir thanked residents for their patience, saying: “There was obviously a degree of frustration among locals, especially early this year.

“The road was closed and there was no work going on but this was impossible due to river conditions and most people understood that.

“Since then I think residents have been impressed with the level of activity that has been going on. We’ve received very few complaints about it.”

The company may organise a re-opening ceremony if it can borrow a car from 1902, the year the iron bridge was built.

Mr Weir said: “We’re trying to find somebody who owns one, or at least a car from the Edwardian era. It would be nice if that could be the first to cross it.

“However, we don’t want to delay the re-opening so if that’s not possible we’ll do something low-key and celebrate formally later.

“Our main objective is to get the bridge open as soon as possible because that is what people want.”

The company’s contractor Balfour Beatty has installed new piling and reinforced the underside of the bridge with steel girders.

The white iron lattices on the sides no longer hold it up but have been put back for decorative purposes.

Utility companies are now relaying pipes and cables and the road will then be resurfaced.

Whitchurch Parish Council chairman Harry Butterworth said: “It will take time for residents to get used to the fact that it’s open again because it has been closed for almost a year.

“People are a little bemused at how long it has taken. Some people will be relieved but others won’t like the fact that there’s traffic noise once again.”

When the bridge re-opens, the cost of crossing on a concessionary pre-paid card will rise from 20p to 29.4p.

The 40p cash toll is not yet affected but the company is to review its position later in the month.

Whitchurch resident Graham Morfey has urged the company to reduce the concessionary toll for villagers.He argued the rise was unfair as residents cannot avoid crossing the bridge unless they take a detour through Goring or Caversham.

But Mr Weir said: “We aim to treat all our users equally. We need a certain level of income and a concession for one group means higher tolls for another group. The best thing we can do for all bridge users is to manage our operations efficiently and thus keep the tolls as low as possible for everyone.

“It is unfortunate that there have been delays to the bridge works; these have significantly increased our costs and these will have to be paid for, over time, by bridge users.

“We have taken steps to spread the repayment of debt so as to minimise the short term cash requirement.”

Mr Weir said the cost of a concessionary toll would never increase beyond 75 per cent of the full charge and that the company would invest in improvements if the Government gave permission to increase the cash toll.

Published 18/08/14

PM joins calls to scrap train timetable
Dr Foster episode being filmed in Henley
Henley homeless man refuses help
Henley living bringing calm to comedian Brand
Motorcyclist injured near Watlington
Shops open for business with another on way
'Fire-breathing dragon' ends pothole misery
Toll bridge must close again for road widening
Heathrow expansion offers chance to discuss Henley noise pollution
Artist's birthday gift for Prime Minister
Race raises 11,000
Townlands Hospital renamed
Police attend traffic collision
Restaurateur to take over The Station House
'Fire-breathing dragon' ends pothole misery
Henley set for starring role in whodunnit novel
Rock band returns to former college
Curry night raises thousands for charity
Crowds enjoy fireworks display
Travel troubles
Latest Video View more from   Henley Standard TV
Leander duo secure honours at Wingfield Sculls
Frieth Hilly attracts Team GB runners
Ramrakash makes Henley appearance
Red trousers encouraged at Hawks match
Youngsters impress at Reading tournament
Top Videos
Most Popular
Higgs Group
Tel: 01491 419400
Tel: 01491 419419
Tel: 01491 419429
Tel: 01491 419499
Tel: 01491 419449
HIGGS GROUP, Caxton House, 1 Station Road, Henley on Thames, Oxfordshire, RG9 1AD.

Cookie Policy | Copyright and Terms | Competition Rules | Contact Us | Advertise with us | Site Map
© Higgs & Co (Printers) Limited 2016  |  Registered in England number 1418717