Henley Standard Property


Order your copy Advertise with us! HENLEY PAGES
Delivering the news from Henley on Thames and South Oxfordshire for over 100 years
  News     Sport    Celebrity   What's On Regulars Community Info Henley Standard TV Lifestyle Property Jobs Classifieds Gallery Trade
                               Follow us    Follow us    Newsfeed Search the Henley Standard  
Bix carriageway repairs to take up to 30 weeks
Published 21/03/14

REPAIRS to the A4130 dual carriageway at Bix will begin in May and take up to 30 weeks to complete.

The drainage network will be replaced and the swallow hole will be excavated and reinstated with free granular material. The fast lanes in both directions will be resurfaced and the slow lane on the Oxford-bound carriageway will be reconstructed.

The road will be closed Henley-bound from May 12 to June 3 to allow a contra-flow traffic system to be installed.

During the contra-flow, the A4130 will be open to cars and light vehicles going both ways. Vehicles wider than 2m that cannot use the contra-flow system will have to follow the diversion. Access to Bix will be maintained at Rectory Lane but those exiting the village will have to use Old Bix Road. Broad Plat Lane will be closed. Resurfacing work will be carried out at the Bix end and Lower Assendon end under temporary traffic signals.

The B480 will be closed and vehicles must use the diversion through Nettlebed via the B481. A 30mph speed limit will be in force through the contra-flow and a free recovery service will be available. The recovery vehicle will be based by the Nettlebed roundabout.

Warning signs will be put up four weeks prior to the start of the work. Oxfordshire County Council is replacing one-and-a-half miles of the drainage network, which runs from outside the Smith Centre in Fair Mile, Henley. Project leader Paul Rowforth said: “The road was put in in 1937 to 1939 and it has been done very well. The main structure is very good. There is a carrier drain on the cemetery side and at the moment very little water gets into the soakaway.”

He said that potholes would be filled in during the work.

Town and county councillor David Nimmo Smith said the road had come to the end of its life. It has taken three years to get the designs organised and get money,” he said. “There will be things to overcome which will cause inconvenience to the people of Henley but there will be no heavy goods vehicles coming over the bridge and going up Fair Mile.”

Published 21/03/14

Man exposed himself in children's playground
First George Clooney now Brad Pitt & Angelina
Couple sought after cash stolen from car
Woman claims from council over lost house sale
Supermoon over Henley caught on camera
National call-up for Blue Coat School duo
Hospital beds to be part of care home
Landlords bid fond farewell to pub
Bests to present prizes at half marathon
In bloom train set to depart
Couple mark Battle of Britain with charity ride
Landlords bid fond farewell to pub
Cash boost for children's centre pool revamp
Man exposed himself in children's playground
First donation made from sale of Youth Centre
No 'blue-rinse brigade' at Literary Festival
Regal Blue is crowned Top Dog
Pub set to re-open with pizza oven
Cycle bridge unveiled
All set for Henley Swim 2016
Latest Video View more from   Henley Standard TV
National call-up for Blue Coat School duo
Golf club open day
Bullock crowned county champion
Harding secures silver
Woodcote/Stoke Row maintain unbeaten record
Top Videos
Most Popular
Higgs Group
Tel: 01491 419400
Tel: 01491 419419
Tel: 01491 419429
Tel: 01491 419499
Tel: 01491 419449
HIGGS GROUP, Caxton House, 1 Station Road, Henley on Thames, Oxfordshire, RG9 1AD.

Cookie Policy | Copyright and Terms | Competition Rules | Contact Us | Advertise with us | Site Map
© Higgs & Co (Printers) Limited 2013  |  Registered in England number 1418717